Tianjin Yuanyang Building Phase II
- Description
-
Tianjin Yuanyang Building Phase II
Construction time: September 2024
Project location: Tianjin
Project overview:
The project is located in the core area of Tianjin City, facing the Haihe River in the south,
facing the Dagu Bridge in the east and adjacent to Tianjin Station. It has a superior geographical location, with a total construction area of about 107,900 square meters and a construction height of 218 meters,
divided into 5 underground floors and 38 above-ground floors. The project adopts the pouring technology of the sliding pipe method, and establishes the internal support model and the sliding pipe model through the BIM application, performs collision inspection, realizes the interlaced arrangement of the sliding pipe in the complex internal support system, and quickly completes the pouring.
TAG: