Steel Structure Performance
| Project Name | Project scale |
| Installation and dismantling of the steel pipe support and temporary steel support system for Anzi East Station, Section 1 of the Civil Engineering Project of Qingdao Metro Line 1, and Anzi Station foundation pit | Qingdao Metro Line 1 Civil Engineering Project Section 1: Anzi East Station and Anzi Station Foundation Pit Steel Pipe Support , Temporary Steel Support System Installation and Disassembly, including welding machines, welding materials, gas and small tools ; All work contents of the process of transporting steel and steel pipe supports , stacking, installation, dismantling, use, cleaning and maintenance |
| Blue Fire Project Hengshui Base Workshop No. 10 Project | The workshop is a portal steel frame structure, covering an area of 5936.43 square meters. |
| Hengshui Mengniu Motor Co., Ltd. 5# and 6# Plants | The construction cost per square meter of workshop 5# is RMB 584, and the area is 6608 square meters. The construction cost per square meter of workshop 6# is RMB 617, and the area is 4365 square meters. |
| Xingtai Oasis Feed Co., Ltd. Dairy Cattle Standardized Scale Farm Construction Project Section 1 | A new manure drying shed of 450 square meters, a feed warehouse of 900 square meters, and a sewage sedimentation tank of 192 cubic meters were built. |
| Cangzhou China Railway Equipment Manufacturing Materials Co., Ltd. Power Plant South Line Cable Corridor Steel Structure and Bridge Fabrication and Installation Project | Steel structure installation: 3,300 yuan/ton, bridge installation: 40 yuan/meter |
| Hebei Yuanlin Intelligent Technology Co., Ltd. factory construction project | Workshop area: 11,976.47 square meters |
| Nanhe County Pet Park Multi-storey Standardized Factory Construction Project Section 1 | The total construction area is 34,372.71 square meters, of which the construction area of 1# and 2# factory buildings are both 11,434.82 square meters, and the construction area of 3# factory building is 11,503.07 square meters. All of them are steel frame structures, independent foundations, and 4 floors above ground. |
| Construction of the National Fitness Center Project in the Mining Area | 4568 square meters |
| Professional subcontractor for the steel structure workshop construction of the comprehensive domestic waste treatment project in Luannan County, Tangshan City | Steel structure workshop is about 1,300 square meters |
| Hollywood Magic Castle Marketing Center Steel Structure Project | Steel structure engineering within the scope of drawings for the Hollywood Magic Castle Marketing Center |
| Poverty Alleviation Workshop Construction Project in Xipingshan Village, Dukoubao Township, Huaian County | Build a new poverty alleviation workshop of 300 square meters and repair 300 square meters of supporting facilities |
| Steel structure installation project for the 1# production workshop of the project with an annual output of 1.5 million high-end bicycles | Steel structure installation, excluding doors and windows, total area 3,779,766 square meters |
| Zhejiang Yudian Technology Co., Ltd. Data Intelligent Equipment Manufacturing Project (Phase I) 1# Plant Steel Structure | / |
| Drying tower grain storage steel structure warehouse project | 1500m² |
| Zuowei Grain Depot 22#~29#, 36# Warehouse Roof Covering Color Steel Project | 22#-26#, 36# warehouse |
| Tianjin Aoxing Technology Development Co., Ltd. newly built 3# factory building | The workshop and comprehensive building will be built with a construction scale of 22,812 square meters and the project covers an area of 32,575 square meters. |
| Metal surface treatment products project with an annual output of 2.56 million tons | The total construction area is 52,958 square meters, with an annual output of 2.56 million tons of galvanized sheets. It includes a galvanizing workshop, a steel rolling workshop, a pickling workshop, a dormitory building, a warehouse, a finished product workshop, a weighing room, a security guard and ancillary facilities. |
| Xiaohezi Yingchun Village Vegetable Sorting Center Storage Warehouse and Processing Workshop Project | New vegetable storage, warehouses, and processing workshops were built, and 7 steel insulated doors, 14 air coolers, 7 refrigeration equipment, 7 computer temperature control boxes, outdoor pipelines, and supporting lighting infrastructure were installed. |
| Huailai County Urban Investment Agricultural Facility Grape Project Design and Construction General Contracting | The project covers a total area of 33,286 square meters (approximately 50 mu), with a total construction area of 20,886 square meters, including 20,636 square meters of multi-span sheds and 150 square meters of mobile management rooms. Supporting facilities include 5,400 square meters of roads, a 2,000 square meter parking lot, 5,000 square meters of green space, 300 meters of water supply pipelines, and the planting of 2,200 grape seedlings. Furthermore, renovations were carried out on 23 old sheds, 400 square meters of fresh-keeping storage, and 800 square meters of old buildings. |
| Production workshop 1# of the project with an annual output of 6,000 tons of finished and semi-finished dishes | Production workshop civil engineering and steel structure engineering |
| Tangshan Yezhan Warehousing and Processing Project | It mainly includes an office building of 1967.4m², a factory building of 20848.45m², and a pool of 114.38m². |
| Central Grain Reserve Hulunbuir Direct Depot Co., Ltd. Arong Branch Canopy Warehouse Renovation Project | The two steel structure canopy warehouses of Arong Branch were renovated for bulk storage, with a renovation area of 5,760 m² and a storage capacity of 20,000 tons after renovation. |
| Steel structure engineering of the second section of the first phase of the construction project of the Shache County Textile and Garment Industrial Park | Steel beams, steel columns, secondary steel, purlins, anchor bolts, high-strength bolts, ordinary bolts, turnbuckle bolts, roof color steel plates, wall color steel plate enclosure parts, etc. |
| Tianjin Fanrong Automobile Technology Co., Ltd. Automobile Parts Production Line Project | The new workshop has a construction scale of 25,485.09 square meters and the project covers an area of 40,218.9 square meters |
| Jiasheng (Tianjin) Metal Products Co., Ltd. Automobile and Home Appliance Parts Production Base Project | The total construction area is 14630.73m², including workshop 1 5841.88m² (1F, building height 12.18m), workshop 2 and shed 7017.92㎡ (including partial 2nd floor, building height 14.28m), office building 1732.05m² (2F, building height 8.40m), guardhouse 1 19.44m² (1F, building height 3.30m), guardhouse 2 19.44㎡ (1F, building height 3.30m). Shallow foundation or pile foundation is planned to be adopted. |
| Qitaihe Longyang Coke and Power Co., Ltd. clean coal energy-saving drying project | A spherical grid greenhouse was built at the coal plant, including foundation, main structure, spherical steel structure grid, embedded parts, color steel enclosure, etc. |
| Xingtang County Municipal Waste Incineration Power Generation Project Steel Structure and Profile Enclosure Engineering | Including but not limited to the main load-bearing steel structure of the incineration room and flue gas purification and fly ash stabilization room, lattice columns, crane beams, steel grid frames, steel roof trusses, steel trusses, steel platforms, steel wall frames, steel purlins, wind-resistant columns, metal surface anti-rust paint, metal surface fire-retardant paint, metal components painted with fire-retardant paint, color steel plate walls, color steel plate roofs, garbage pit roof base, garbage pit roof, etc.; cooperate to complete subsystem debugging and the whole set of startup debugging, performance testing, handover to production, the whole set of commissioning and operation maintenance of the power plant, completion acceptance, engineering data collation and other content work; repair defects: undertake the work of repairing defects during the defect liability period. |
| Wugang Zhongchang Fire Safety Upgrade and Renovation Project EPC Project | (1) Renovation of the warehouse fire wall: (2) Painting of the warehouse steel structure with fireproof paint: (3) Renovation of the single-layer color steel plate of the warehouse exterior wall into a double-sided corrugated steel plate composite insulation exterior wall: (4) Addition of smoke exhaust windows to the warehouse: (5) The original auto repair workshop needs to be demolished, and a new fire pump room, power distribution room, and generator room need to be built. The original fire pumps and transformers need to be replaced, and new fire distribution equipment such as diesel generators need to be added: (6) Renovation of the fire pipe network system in the warehouse area, renovation of the original warehouse fire hydrants, and addition of a 50m² water tower: (7) Addition of automatic fire extinguishing systems to the four warehouses 25#, 30#, 32#, and 33#: (8) Demolition of the partial exterior wall enclosure structure of the 31# workshop; (9) Addition of fire alarm systems to the 32# and 33# warehouses, and connection to the existing control host: (10) Blocking of the north side corridor of the small parts repair warehouse, adding a south side entrance and exit and a canopy, and pre-buried security and fire protection crossing conduits. |
| Finished Food Workshop No. 2, Far East Food Ingredients (Xingtai) Co., Ltd. | Production workshop civil engineering and steel structure engineering |
| Steel structure part of the industrial wastewater reuse and zero discharge project of Tianjin Rongcheng United Steel Group Co., Ltd. | Production and installation of all steel structures and color plates within the quotation range |
| Tianjin Rongcheng United Steel Group Co., Ltd. Industrial Wastewater Reuse Zero Discharge Project - Evaporation Workshop Steel Structure | Evaporation workshop steel structure and color plate production and installation |
| Tiancheng Yunxi North District Steel Structure Professional Subcontractor | Tiancheng Yunxi North District Project 11# Building Steel Structure Modeling Frame Production, Installation, and Topcoating Engineering Construction |
| Tianjin Rongcheng United Steel Group Co., Ltd. Industrial Wastewater Reuse Zero Discharge Project - Ozone Workshop and Sludge Room Steel Structure | Production and installation of steel structure and color plate for sludge room in ozone workshop |
| General contracting for the steel structure design and construction of the Shuozhou Civil Airport terminal building and the Shuozhou Local Specialty Products Exhibition Hall complex in Shanxi Province | The scope of steel structure contracting includes measurement and positioning, steel bar perforation and drilling at joints, in-depth design, production and positioning of embedded parts, anchor bolts, and high-strength bolts, installation, procurement and inspection and testing of materials, steel structure processing and production, opening and closing of reserved holes, stud welding, rust removal, flaw detection, primer, intermediate paint, topcoat, on-site and off-site transportation, calibration, assembly, splicing, hoisting, installation, repainting, various measures such as cranes, scaffolding, stands, temporary steel platforms, lifts, safety nets, dense mesh, scaffolding boards, etc., warranty, finished product protection, completion cleaning, completion acceptance, completion data compilation and inspection, etc.; procurement, application, repainting of fire retardant paint, erection and dismantling of construction scaffolding, hanging safety ropes, laying safety nets, rust removal, cleaning of the base layer, spraying of anti-rust paint, etc. |
| Ministry of Railway Transportation's new thawing warehouse project for Tiangang and Tianjiao stations | The thawing warehouse is 200m long, 5m wide and 5.5m high. The vehicle thawing warehouse of Tianjiao Station uses 0.9MPa steam after secondary decompression from the dry coke quenching workshop of Tianjiao Company for heating. The steam pipe is connected from the third-floor platform of the dry coke quenching workshop to the south along the wall through the pillars and introduced into the south side of the tipper workshop (the pipe is about 300m long), and then connected to the thawing warehouse about 150m to the west. |
| Steel structure professional subcontractor for China Agricultural Wholesale Products Zunhua project | All work related to this subcontract project includes procurement and transportation of raw materials, sandblasting and rust removal, raw material correction, layout, marking, cutting, component assembly, straightening, drilling, splicing, welding, flaw detection, finished product correction, rust removal, spraying one coat of epoxy zinc-rich primer, off-site transportation of components, on-site verification of axis and elevation, hoisting of components, temporary fixation, component welding and fixation, weld inspection, shaping and surface cleaning, spraying one coat of micaceous iron intermediate paint, spraying two coats of fluorocarbon topcoat, finished product protection, erection and dismantling of construction scaffolding, reservation and embedding, embedded parts positioning, installation, mobile crane, deepening of drawings, on-site transportation of components, loading and unloading of vehicles, column foot grouting (or concrete), site cleaning after completion, etc. |
| project of extrusion workshop 4 of Hengshui Heping Aluminum Technology Co., Ltd. |
Extrusion Workshop 4 covers an area of 30,475m² and a construction area of 31,396.15m² The main structural form is portal frame + steel frame structure |
| Hengshui Heping Aluminum Technology Co., Ltd. Finished Product Warehouse 2 (Axis 1-26) Steel Structure Construction Project |
Finished product warehouse 2 covers an area of 17,710 m² (of which axes 1-26 cover an area of approximately 11,000 m²) and a building area of 17,710 m² (of which axes 1-26 cover an area of approximately 11,000 m²). The main structural form is portal frame structure. |
| Pingshan County Municipal Waste Incineration Power Generation Project Main Plant and Ancillary Steel Structure Professional Subcontracting Project | Complete the work required within the scope of the main plant and ancillary steel structure drawings: installation of garbage cranes, truck crane slides and electric hoist tracks in the main plant and ancillary buildings, etc. |
| Cold Chain Logistics (Shijiazhuang) Co., Ltd. Cold Chain Logistics Project Cold Storage (I), Cold Storage ( II ) , Cold Storage ( III ), Cold Storage ( IV ) Steel Structure Main Fabrication Subcontract | 1200t of steel structure production and 250t of steel purlin production |
| Professional subcontractor for steel structure construction of 7 projects including Cultural Palace | The assembly and transportation of steel beams and other steel components shall be carried out in accordance with the specifications in the drawings to complete all the construction content required for the project. |
| Tianjin Steel Pipe Manufacturing Co., Ltd. scrap steel yard dust control project (factory building) EPC project | 42486.67 square meters, steel frame structure, single-story factory building, one floor above ground. Building height 24.0m |
| Ministry of Railway Transportation Tianjiao New Thawing Warehouse Project (Tiangang Station) | A 200-meter-long, 5-meter-wide, 5.5-meter-high steel thawing facility will be constructed on the existing track connecting the dumper. The facility will utilize steam as its heat source, connected via a steam pipeline from the coking plant's power plant. Located on track 3 of Tiangang Station, the facility will include civil engineering, steel structure, water supply and drainage, electrical engineering, instrumentation, and thermal engineering. |
| Steel structure fabrication and installation for the second phase of the newly built Yaohua Middle School Binhai School in Tianjin |
Including but not limited to material procurement, transportation, production, installation, defect repair, maintenance, retest sampling, raw material correction, layout, cutting, accessory assembly, reservation and embedding, welding, correction, finished product inspection, friction surface, welding studs, bottom cleaning, rust removal, steel structure painting and fire retardant coating, laying of corrugated roof panels, pre-assembly, loading and unloading, on-site transportation, finished product protection, provision of paint for site repair, quality maintenance, component transportation Transport to the designated location on the construction site; technical assistance and cooperation for on-site assembly and installation; construction site services and related on-site production coordination services; technical measures during construction; and all work that can be reasonably inferred to be within the scope of the steel structure contract. |
| Shanxi Dayuan Coal Industry Co., Ltd. raw coal storage and processing shed and gangue washing shed project |
New raw coal storage and processing shed: building height is 13.7m, irregular shaped shed, length 87.7m, width 38.39m, with a total construction area of 2979.08m ; New waste washing shed project: building height is 9m (outdoor floor to eaves), length is 40.50m , width is 29.00m , with a total construction area of 1174.5㎡ . Steel frame structure (trapezoidal steel roof truss) |
| Yizhi Smart Logistics Warehousing Clean Energy Post-Selection Product Library Project | The total construction area is approximately 53,504 square meters |
| Dalian Huarui Heavy Industry Wafangdian Base Large-scale High-end Wind Power Core Components Intelligent Manufacturing Steel Structure Project | Steel component processing and production |
| Hebei Rucheng Steel Structure Co., Ltd.'s annual output of 100,000 tons of steel structure production and construction project | Newly build 45,158.26 square meters of production workshop, guardhouse, warehouse, fire water tank pump room |
| Tianjin Steel Pipe Manufacturing Co., Ltd. 250 unit green storage and transportation transformation project | The new steel pipe transfer workshop for Unit 250 has a total area of 9,800 square meters and features two spans, an axis length of 127.8 meters, a span of 36 meters, a total axis span of 72 meters, a cornice height of 15.6 meters, a maximum height of 20.00 meters, a maximum number of floors, a maximum span of 36 meters, a maximum column spacing of 18 meters, and a crane. The steel structure has a maximum height of 20 meters and a maximum span of 36 meters. |
| Dayou Zhongkai Runnong Modern Agricultural Industrial Park Project |
The project mainly includes: plant factory and seedling R&D center, cloud smart cold chain logistics distribution center, clean vegetable primary processing and sorting and packaging center, biological organic fertilizer engineering center, digital party building and modern agricultural technology demonstration center and other projects. The construction of plant factory and seedling R&D center: It is planned to cover an area of 1,800 mu and build a 1 million square meter full-environment intelligent film (imported material) multi-span greenhouse in two phases; The construction content of this project is as follows: 1. Construction of Digital Party Building and Modern Agricultural Science and Technology Demonstration Center: construction area of 8,400 square meters, total investment of 84 million yuan; 2. Talent apartments and reception center: construction area of 7,900 square meters, total investment of 39.5 million yuan; 3. Construction of Cloud Smart Cold Chain Logistics Distribution Center, Clean Vegetable Deep Processing, Sorting and Packaging Center, and Bio-organic Fertilizer Center: construction area of 19,000 square meters, total investment of 114 million yuan; 4. Construction of Plant Factory and Seedling R&D Center: construction area of 8,930 square meters, total investment of 27 million yuan; 5. Full-environment intelligent film (imported materials) multi-span greenhouse: construction area of 200,000 square meters, total investment of 140 million yuan. |
| Steel structure engineering for the library and indoor gymnasium of the new campus project of Baoding Vocational and Technical Education Center | The second floor above ground, the main body adopts steel frame-supporting structure |
| Shijiazhuang Tongfu Health Industry Park Project Steel Structure Processing Engineering | The entire construction process includes processing of steel columns, steel beams, cross columns, T-columns, steel ladder railings, tie rod supports, corner braces and roof system steel components, sandblasting for rust removal, painting (topcoat, epoxy zinc-rich primer 70um, epoxy micaceous iron intermediate paint 60um.), component packaging and loading, transportation to the location designated by the contractor, testing, acceptance, etc. to complete the entire construction process of component production. |
| Sanya Gome Haitang Bay Project Phase II Hotel Central Area Main and Steel Structure Engineering | The planned total construction area is approximately 104,957.11 m² |
| Hebei Chunao Industrial Co., Ltd. Safety and Environmental Protection Technology Transformation Project Railway Logistics Clean Coal Environmental Protection Coal Shed Project | The total construction area is approximately 48,000 square meters |
| Hebei Chunao Industrial Co., Ltd. Safety and Environmental Protection Technology Transformation Project Raw Coal Shed and Clean Coal Shed Project | The total building area is approximately 41,492 square meters, including 12,502 square meters of raw coal shed and 28,990 square meters of clean coal shed. |
| 2024 Agricultural Products Processing and Storage Project Section 4 | Build 2 grain storage rooms with a construction area of 5003.25m², 1 floor, and a steel structure. |
| China Second Metallurgical Group Rongwu Expressway New Line, Beijing-Dezhou Expressway Monitoring Communication (Settlement) Sub-center Project Steel Structure Fabrication and Installation Professional Subcontract | Production project: 3,550,420 yuan; installation project: 3,668,736.8 yuan |
| Ulan Buhe Desert Cistanche Whole Industry Chain Innovation and Upgrading Development and Construction Project | Drying workshop, extraction workshop |
| Construction of the second section of steel structure fabrication and installation for the general contracting project of the administrative office area of Jinding Heavy Industry Co., Ltd. | Steel structure construction of comprehensive service building |
| Professional subcontractor for steel structure construction of Daming County Education and Training Center construction project | The main steel structure project of the comprehensive building covers an area of 37,815.11 m² and has a frame structure with a building height of 23.85m, 5 floors above ground and 1 floor above ground. |
| Subcontract for the steel structure engineering of the second phase of the survey, design and construction general contracting project of the Nansha National Cultural and Sports Complex Ecological Dike Construction Project (north of 21 Creek) | Professional construction of steel pipe columns, steel gutters, steel purlins, steel supports, hollow steel columns and other sporadic steel components |
| 144m Steel Tube Concrete Tied Arch Bridge Steel Structure Fabrication | Total amount: 1556 tons |
| Bahekou flood storage and sliding area construction project - supporting building (structure) engineering | / |
| Ganqimaodu Port Processing Park Yizhi Smart Logistics Co., Ltd. Environmentally Friendly Coal Shed Construction Project | No. 1 by-product storage yard coal shed, building area 20,000 m² |
| Daming County Education and Training Center construction project comprehensive building roof steel structure and comprehensive building, dormitory building, guardhouse roof steel structure modeling construction | / |
| Anping High-end Porous Materials Industrialization Base Phase II Construction Project Area A Design and Construction (EPC) | The total construction area is 53,382.06 square meters, including 1# plant 10,155.52 square meters (including 339.40 square meters of fire pump room), 2# plant 18,223.62 square meters, 3# plant 9,111.81 square meters, R&D building 6,467.47 square meters, service building 1,755.41 square meters, dormitory building 4,003.79 square meters, pilot plant 3,549.42 square meters, gate guard room 115.02 square meters |