• Description
  • (1) Renovation of the warehouse firewall;
    (2) Painting of the warehouse steel structure with fireproof paint;
    (3) Renovation of the single-layer color steel plate of the warehouse exterior wall into a double-sided corrugated steel plate composite insulation exterior wall;
    (4) Addition of smoke exhaust windows to the warehouse;
    (5) The original auto repair workshop needs to be demolished, and a new fire pump room, transformer room, and generator room need to be built. The original fire pumps and transformers need to be replaced, and new fire distribution equipment such as diesel generators need to be added;
    (6) Renovation of the fire pipe network system in the warehouse area, renovation of the original warehouse fire hydrants, and addition of a 50m² water tower;
    (7) Addition of automatic fire extinguishing systems to the four warehouses 25#, 30#, 32#, and 33#;
    (8) Removal of the partial exterior wall enclosure structure of the 31# workshop;
    (9) Addition of fire alarm systems to the 32# and 33# warehouses, and connection to the existing control host;
    (10) Blocking of the north corridor of the small parts repair warehouse, adding a south entrance and exit and a canopy, and pre-buried security and fire protection crossing conduits.