• Description
  • Including but not limited to the main load-bearing steel structure of the incineration room and flue gas purification and fly ash stabilization room, lattice columns, crane beams, steel grids, steel roof trusses, steel trusses, steel platforms, steel wall frames, steel purlins, wind-resistant columns, metal surface anti-rust paint, metal surface fire-retardant paint, metal components painted with fire-retardant paint, color steel plate walls, color steel plate roofs, garbage pool roof base, garbage pool roof, etc.; cooperate to complete subsystem debugging and the whole set of startup debugging, performance testing, handover to production, the whole set of commissioning and operation maintenance of the power plant, completion acceptance, engineering data collation and other content work; repair defects: undertake the work of repairing defects during the defect liability period.